START CAMPUS - AT 60KV Air Line – Sines
Detalhes
Description: Design and construction of a 60KV high voltage overhead line to power a Data Center with a total installed capacity of 495 MW.
Location: Sines (Portugal)
Client: Start Campus
Year of Completion: Ongoing