Infrastructures and Networks

START CAMPUS – AT 60KV Air Line – Sines

Construction of substation for photovoltaic solar power plants, adjacent E-Redes substation and overhead line, including detailed design, supplies, installations and commissioning of all the different equipment..

PHOTOVOLTAIC SOLAR PLANT – BARCOS SUBSTATION – 60/30KV

Full EPC - Design and assembly of general electrical installations and civil works - Development and installation of high voltage equipment, protection-command-control system and commissioning. Overhead line 60kV – (E-Redes) Photovoltaic Substation 60kV/30 kV (Client)

SOLAR PHOTOVOLTAIC PLANT – PESSEGUEIRO SUBSTATION – 60/30KV

Full EPC - Design and assembly of general electrical installations and civil works - Development and installation of high voltage equipment, protection-command-control system and commissioning. Photovoltaic Substation 60kV/30 kV (Client)

SOLAR PHOTOVOLTAIC PLANT – QUINTA DO ANJO SUBSTATION – 60/20KV

Full EPC - Design and assembly of general electrical installations and civil works - Development and installation of high voltage equipment, protection-command-control system and commissioning. Overhead line 60kV – (E-Redes) Photovoltaic Substation 60kV/20 kV (Client)

PHOTOVOLTAIC SOLAR PLANT – PADERNE SUBSTATION

Construction of the substation for the photovoltaic plant, adjacent E-Redes substation and OHL, including detail design, supplies, installs and commissions of all different equipment.

60/30/15/10 kV Substations – Continuous Contract

Project of Execution and Construction of 60/30/15/10 kV Substations.

PHOTOVOLTAIC SOLAR PLANT – COTOVIO SUBSTATION

Construction of substation and OHL for photovoltaic solar plant including detail design, supplies, installs and commissions of all different equipment.

STARSUL – Electric Mobility

Installation of 2 charging posts of 22KW, with 2 sockets each. Including all the supply and installation, from the infrastructures to the charging stations up to the interconnection with the Management Platform.

Hills of Serpa Electrification

Distribution network in high, medium and low voltage; Electrical installations of use, with 9.35 km of medium voltage line area, with 9.07 km of low voltage line area, with 8 transformer stations with a total of 400 kVA of installed power and 25 houses and farms fed.

CORUCHE SUBSTATION – 60/30KV + 60KV OVERHEAD LINE

Design and Construction of general electrical installations and civil construction - Development and installation of high voltage equipment, protection-command-control system and Commissioning.

Subestação de Sta. Maria Lamas

Sta. Maria Lamas substation – 60/15 kV

Design and Construction, 6 MVA Line/Transformer Panel.

Sporting Clube de Portugal Alcochete Academy

Installation of lighting in the Soccer Training Fields and improvement of the electrical infrastructure of the Complex.

Construction of HV Overhead Line – Ourique (REN) – Porteirinhos

Power distribution network in High Voltage and optical fibre network.

Subestação de Portimão - 400/150/60 kV

Portimão Substation – 400/150/60 kV

400 kV - 120 MVA phase reactance panel.

Parque Solar de Loures

Loures Solar Park – 2.2 MW

HV, MV and LV Electrical Facilities; Mechanical Assemblies; Building Construction.

CABINDA EMERGENCY PLAN

AV, MV and LV power distribution network; Electrical installations for use.

ALTO MIRA SUBSTATION – 400/220/60 KV

Development and installation of 220kv line panel.

VILA POUCO AGUIAR SUBSTATION – 220/60KV

Development and Installation of 220kV line panel.

CARRAPATELO SUBSTATION – 220/60KV

Development and Installation of 220/60kV 170MVA transformer.

Iluminação IC 17 - CRIL

IC 17 Lighting – CRIL

Medium and Low Voltage electrical installations; Public and street lighting.

FRADES SUBSTATION – 150/60KV

Development and Installation of 150/60kV 170MVA transformer.

Instalações elétricas de baixa tensão e iluminação decorativa.

Troia Infrastructures – Outdoor Lighting

Low voltage electrical installations and decorative lighting.

CUSTÓIAS SUBSTATION – 220/60KV

Development and Installation of Transformer from 170MVA to 220/60kV.

Subestação do Pocinho - 220/60 kV

Pocinho Substation – 220/60 kV

Line Reactance Panel 220 kV - 120 MVA.

Serviços Afetados CRIL, Lisboa

CRIL Affected Services, Lisbon

Water network; Gas network; High, Medium and Low Voltage electrical installations; Communications systems; Traffic and street lighting.

BOAVISTA SUBSTATION – 60/15 kV

Design and erection of general electrical installations and civil works - Development and installation of high voltage equipment, protection-command-control system and commissioning.

Aproveitamento Hidroagrícola de Brinches

Brinches Hydro-agricultural operation

Sectioning and transformer stations; Low Voltage electrical installations; Fire detection, intrusion and surveillance systems; HVAC; Pumping and filtration hydraulic systems; Irrigation network; Supervisory and telemanagement systems.

FALAGUEIRA SUBSTATION – 400/150/60 kV

Development and Installation of 150kV line panel

Subestação de Penela - 220/60 kV
Central Fotovoltaica de Moura

Moura Photovoltaic Plant – 46 MW

HV, MV and LV Electrical Facilities; Mechanical Assemblies; Management, Maintenance and Operation (ongoing).

Subestação da CNE

CNE substation

Design and construction of the 60/6 kV substation; 40 MVA; Medium Voltage electrical infrastructures.